Checking ERC (Well Check)
This process checks the connection of the n-well and p-substrate. The C5 process used here is an n-well process. The p-type substrate is common to all NMOS devices and should be grounded. One of the electrical rule checks (ERCs) is to verify that the p-well (in this case p-substrate) is always connected to ground. Further,…